• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Test Port Elbow.
Figure 10. Plate Assembly.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  392    393    394    395    396  397  398    399    400    401    402  
img
.
TM 5-3805-296-23-5
0322
INSTALLATION CONTINUED
NOTE
Install fittings as noted during removal.
6. Install new O-ring (Figure 9, Item 9) and fitting (Figure 9, Item 7) on implement pilot solenoid pressure reducing
valve assembly (Figure 9, Item 6).
7. Install new O-ring (Figure 9, Item 8) on fitting (Figure 9, Item 7).
8. Install new O-ring (Figure 9, Item 3) and fitting (Figure 9, Item 4) on implement pilot solenoid pressure reducing
valve assembly (Figure 9, Item 6).
9. Install new O-ring (Figure 9, Item 5) on fitting (Figure 9, Item 4).
10. Install new O-ring (Figure 9, Item 2) and fitting (Figure 9, Item 1) on implement pilot solenoid pressure reducing
valve assembly (Figure 9, Item 6).
11. Install new O-ring (Figure 9, Item 10) on fitting (Figure 9, Item 1).
Figure 9. Implement Pilot Solenoid Pressure Reducing Valve Assembly.
0322
0322-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.