• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Plate Assembly.
Figure 5. Test Port Elbow.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  387    388    389    390    391  392  393    394    395    396    397  
img
.
TM 5-3805-296-23-5
0322
REMOVAL CONTINUED
NOTE
Note location and position of fittings to aid in assembly.
12. Remove O-ring (Figure 4, Item 10) from fitting (Figure 4, Item 1). Discard O-ring.
13. Remove fitting (Figure 4, Item 1) and O-ring (Figure 4, Item 2) from implement pilot solenoid pressure reducing
valve assembly (Figure 4, Item 6). Discard O-ring.
14. Remove O-ring (Figure 4, Item 5) from fitting (Figure 4, Item 4). Discard O-ring.
15. Remove fitting (Figure 4, Item 4) and O-ring (Figure 4, Item 3) from implement pilot solenoid pressure reducing
valve assembly (Figure 4, Item 6). Discard O-ring.
16. Remove O-ring (Figure 4, Item 8) from fitting (Figure 4, Item 7). Discard O-ring.
17. Remove fitting (Figure 4, Item 7) and O-ring (Figure 4, Item 9) from implement pilot solenoid pressure reducing
valve assembly (Figure 4, Item 6). Discard O-ring
Figure 4. Implement Pilot Solenoid Pressure Reducing Valve Assembly.
0322
0322-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.