• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Test Port Elbow.
Figure 7. Test Port.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  389    390    391    392    393  394  395    396    397    398    399  
img
.
TM 5-3805-296-23-5
0322
REMOVAL CONTINUED
NOTE
If installing new implement pilot solenoid pressure reducing valve body, perform steps 21
and 22 on original implement pilot solenoid pressure reducing valve body.
21. Install original test port (Figure 6, Item 2) on original implement pilot solenoid pressure reducing valve
(Figure 6, Item 3).
22. Install original dust cover (Figure 6, Item 1) on original implement pilot solenoid pressure reducing valve
(Figure 6, Item 3).
Figure 6. Original Implement Pilot Solenoid Pressure Reducing Valve Body.
0322
END OF TASK
CLEANING AND INSPECTION
000322
1. Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0539).
2. Clean and inspect all components IAW Electrical General Maintenance Instructions (WP 0540).
END OF TASK
0322-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.