• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Original Implement Pilot Solenoid Pressure Reducing Valve Body.
Figure 8. Test Port Elbow.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  390    391    392    393    394  395  396    397    398    399    400  
img
.
TM 5-3805-296-23-5
0322
INSTALLATION
000322
NOTE
Complete steps 1 and 2 if new implement pilot solenoid pressure reducing valve is being
installed.
1. Remove dust cover (Figure 7, Item 1) from test port (Figure 7, Item 2).
2. Remove test port (Figure 6, Item 2) and O-ring (Figure 7, Item 3) from implement pilot solenoid pressure
reducing valve (Figure 7, Item 4). Discard O-ring.
Figure 7. Test Port.
0322
0322-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.