• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Test Port.
Figure 9. Implement Pilot Solenoid Pressure Reducing Valve Assembly.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  391    392    393    394    395  396  397    398    399    400    401  
img
.
TM 5-3805-296-23-5
0322
INSTALLATION CONTINUED
NOTE
Install fittings as noted during removal.
3. Install new O-ring (Figure 8, Item 5) and elbow (Figure 8, Item 2) on implement pilot solenoid pressure
reducing valve (Figure 8, Item 7), tighten jam nut (Figure 8, Item 6).
4. Install new O-ring (Figure 8, Item 4) and test port (Figure 8, Item 3) on elbow (Figure 8, Item 2).
5. Install dust cover (Figure 8, Item 1) on test port (Figure 8, Item 3).
Figure 8. Test Port Elbow.
0322
0322-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.