• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Solargizer In-line Fuse.
Figure 21. Negative Arctic Start Aid Battery Cable at Junction Block.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  238    239    240    241    242  243  244    245    246    247    248  
img
.
TM 5-3805-296-23-5
0309
NATO SLAVE RECEPTACLE CABLE INSTALLATION CONTINUED
19. Install battery cover (Figure 19, Item 1) on machine.
20. Install two washers (Figure 19, Item 4) and wing nuts (Figure 19, Item 3) on rods (Figure 19, Item 2).
Figure 19. Battery Cover.
0309
21. Close right engine door (Figure 20, Item 4).
22. Install floor plate (Figure 20, Item 1) on machine.
23. Open right engine door (Figure 20, Item 4).
24. Install four washers (Figure 20, Item 3) and bolts (Figure 20, Item 2) on machine.
Figure 20. Floor Plate.
0309
0309-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.