• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. NATO Slave Receptacle Cable and Solargizer Terminal.
Figure 20. Floor Plate.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  237    238    239    240    241  242  243    244    245    246    247  
img
.
TM 5-3805-296-23-5
0309
NATO SLAVE RECEPTACLE CABLE INSTALLATION CONTINUED
NOTE
Route and install cables as noted during removal.
15. Connect solargizer in-line fuse connector (Figure 17, Item 1) to solargizer wire connector.
Figure 17. Solargizer In-line Fuse.
0309
NOTE
Route and install cables as noted during removal.
16. Install negative battery cable (Figure 18, Item 4) on batteries (Figure 18, Item 5).
17. Tighten two nuts (Figure 18, Item 1) on clamps (Figure 18, Item 2).
18. Position two covers (Figure 18, Item 3) on clamps (Figure 18, Item 2).
Figure 18. Negative Battery Cable at Batteries.
0309
0309-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.