• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 23. NATO Slave Receptacle Cable and Solargizer Terminal.
STARTER POSITIVE CABLES AND JUNCTION BLOCK REPLACEMENT

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  242    243    244    245    246  247  248    249    250    251    252  
img
.
TM 5-3805-296-23-5
0309
NATO SLAVE RECEPTACLE INSTALLATION CONTINUED
NOTE
Negative cable attaches to bottom of NATO slave receptacle. Positive cable attaches to
top of NATO slave receptacle.
Route and install cables and terminals as noted during removal.
4. Install positive battery cable (Figure 24, Item 7) on top of NATO slave receptacle (Figure 24, Item 5).
NOTE
Perform step 5 only if machine is equipped with arctic start aid.
Tag and mark all cables to aid in installation.
5. Install positive arctic start aid battery cable (Figure 24, Item 4) on top of NATO slave receptacle
(Figure 24, Item 5).
6. Install solargizer terminal (Figure 24, Item 3), new lockwasher (Figure 24, Item 6), and bolt (Figure 24, Item 2)
on top of NATO slave receptacle (Figure 24, Item 5).
7. Position cover (Figure 24, Item 1) on NATO slave receptacle (Figure 24, Item 5).
Figure 24. NATO Slave Receptacle Cable and Solargizer Terminal.
0309
END OF TASK
FOLLOW-ON TASKS
000309
1. Close right engine doors (TM 5-3805-296-10).
2. Close front hood (TM 5-3805-296-10).
3. Verify correct operation of machine (TM 5-3805-296-10).
END OF TASK
END OF WORK PACKAGE
0309-21/(22 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.