• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. NATO Slave Receptacle Cable P-clamp and Bracket.
Figure 17. Solargizer In-line Fuse.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  236    237    238    239    240  241  242    243    244    245    246  
img
.
TM 5-3805-296-23-5
0309
NATO SLAVE RECEPTACLE CABLE INSTALLATION CONTINUED
NOTE
Negative cable attaches to bottom of NATO slave receptacle. Positive cable attaches to
top of NATO slave receptacle.
Route and install cables and terminals as noted during removal.
10. Position positive battery cable (Figure 16, Item 7) on top of NATO slave receptacle (Figure 16, Item 5).
NOTE
Perform step 11 only if machine is equipped with arctic start aid.
11. Position positive arctic start aid battery cable (Figure 16, Item 4) on top of NATO slave receptacle
(Figure 16, Item 5).
12. Position solargizer terminal (Figure 16, Item 3) on top of NATO slave receptacle (Figure 16, Item 5).
13. Install new lockwasher (Figure 16, Item 6) and bolt (Figure 16, Item 2) on NATO slave receptacle
(Figure 16, Item 5).
14. Position cover (Figure 16, Item 1) on bolt (Figure 16, Item 2).
Figure 16. NATO Slave Receptacle Cable and Solargizer Terminal.
0309
0309-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.