TM 9-4940-568-34
3-79
NOTE
Left and right side hoses are
installed the same. Left side
shown.
(11) Install two fittings (9) and nuts (10) on
mast (3).
(12) Install four preformed packings (8) and
hoses (4 thru 7) on fittings (9).
(13) Install four clamps (2) and eight screws
(1) on mast (3).
END OF TASK
Follow-On Maintenance
Install boom base section
(para 3-17).
Lubricate pivot pins,
(TM 9-4940-568-10).
Check crane for proper
operation and hydraulic
leaks, (TM 9-4940-568-10).
Load test crane
(para 3-5).