TM 9-4940-568-34
3-82
3-22. CABLE FOLLOWER REPLACEMENT/REPAIR (Continued)
(5) Install two bearings (13) in rollers (10).
(6) Install two washers (11), rollers (10),
thrust washers (9), and washers (8) on
shaft (12) with screws (7).
(7) Install two springs (5) on posts (6).
d.
Installation
(1) Apply sealing compound to threads of
two screws (1).
(2) Install cable follower (3) on hoist
assembly (4) with six thrust washers (2)
and two screws (1).
WARNING
Use
care
when
removing
springs. Springs are under ten-
sion and can act as projectiles
when released. Failure to com-
ply may result in injury to person-
nel.
(3) Attach springs (5) to hoist assembly (4).
END OF TASK
Follow-On Maintenance
Install hoist assembly,
(para 3-26).
Check crane for proper
operation and hydraulic
leaks, (TM 9-4940-568-10).
NOTE
Roller guide removed for clarity.