TM 9-4940-568-34
3-75
WARNING
To prevent personal injury, ex-
treme care must be taken to
properly handle heavy overhead
objects. Make sure all slings and
straps are safe to use and are
secured properly. Make sure
there are no obstacles in the
way. Keep clear of all sus-
pended loads.
(2) With help from assistant, attach lifting
device to tension link (6) and install
tension link (6) in turntable (12) with
pivot shaft (11).
(3) Install two rivet eyebolts (10) in pivot
shaft (11).
(4) Apply sealing compound to threads of
two screws (7).
(5) With help from assistant, install two
bushings (9) and washers (8) in rivet
eyebolts (10) with screws (7).
(6) Tighten two screws (7) to 135 lb-ft (183
N.m).
(7) With help from assistant, install tension
link (6) with pivot shaft (5).
(8) Install two rivet eyebolts (4) in pivot
shaft (5).
(9) Apply sealing compound to head and
threads of two screws (1).
(10) Install two bushings (3) and washers (2)
in rivet eyebolts (4) with screws (1).
(11) Tighten two screws (1) to 135 lb-ft (183
N.m).
END OF TASK
Follow-On Maintenance
Lubricate pivot shafts,
(TM 9-4940-568-10).
Check crane for proper
operation and hydraulic
leaks, (TM 9-4940-568-10).
Load test crane
(para 3-5).
