1
2
2
4
3
TM 9-4940-568-34
7-70
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
d. Relocating The Timing Pin
e. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine installed on stand, (Para 7-2)
Valve cover rocker levers and push rods removed,
(TM 9-4940-568-20)
Camshaft removed, (Para 7-7)
Fuel injection pump removed, (Para 5-17)
Oil pan removed, (TM 9-4940-568-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 67, Appendix F)
Feeler Gage (Item 21, Appendix F)
Hammer, Plastic (Item 30, Appendix F)
Indicator, Dial, Set W/Magnetic Base
(Item 33, Appendix F)
Wooden Dowels (Appendix C)
7-9. FRONT GEAR HOUSING REPLACEMENT.
Materials/Parts - Continued
Grease (Item 13, Appendix B)
Oil, Lubricating (Item 17, Appendix B)
Gasket (Item 23, Appendix E)
Materials/Parts
Adhesive, RTV 108 (Item 2, Appendix B)
Compound, Sealing (242) (Item 29, Appendix B)
a.
Removal.
(1)
Remove 11 gear housing screws (1) from
gear housing (2).
(2)
Using a plastic hammer, remove the gear
housing (2) and gasket (3) from cylinder
block (4). Discard gasket.