TM 9-4940-568-34
3-100
3-28. TENSION LOAD CELL REPLACEMENT (Continued)
(15) Connect tension load cell connector (1)
to overload shutdown box (2).
(16) Connect proximity sensor connector (3)
to overload shutdown box (2).
END OF TASK
Follow-On Maintenance
Check crane for proper
operation and hydraulic
leaks, (TM 9-4940-568-10).
Load test crane
(para 3-5).