TM 9-4940-568-34
3-99
NOTE
Access to measure gap can be
obtained through bottom of hoist
drum.
(7) Tighten rear swivel nut (19) on tension
load cell (18) until gap between hoist
assembly (20) and boom brace (16) is
0.125 in. (.318 cm).
(8) Install jam nut (17) on tension load cell
(18).
(9) Apply sealing compound to threads of
allen head screw (14).
(10) Install stop block (15) on boom brace
(16) with allen head screw (14).
(11) Position clamp (11) on tension load cell
cable (12).
(12) Install clamp (11) on boom stud (13) with
washer (10), lockwasher (9) and nut (8).
(13) Connect two hydraulic hoses (6) to
fittings (7).
(14) Connect hydraulic hose (4) to check
valve (5).