• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 38. Ether Start Solenoid.
Figure 1. Cooling System Cap.

Field Maintenance Manual For Military 621G Scraper -4 Page Navigation
  499    500    501    502    503  504  505    506    507    508    509  
img
.
8
TM 5-3805-296-23-4
0256
FIELD MAINTENANCE
-
COOLING SYSTEM SERVICE
0
256
Draining and Flushing Procedure, Coolant Level Check
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-3805-296-10)
0
(WP 0550, Item 181)
Front hood opened (TM 5-3805-296-10)
0
0
Gloves, Rubber (WP 0550, Item 74)
Right engine door opened
0
0
Pan, Drain (WP 0550, Item 118)
(TM 5-3805-296-10)
0
0
Goggles, BII Item (TM 5-3805-296-10)
0
Drawings Required
0
Materials/Parts
RPSTL Figures 23, 52 and 103
0
0
Antifreeze, Permanent, Ethylene Glycol,
Estimated Time to Complete
Inhibited (WP 0549, Item 2)
0
0
2.5 hr
Rag, Wiping (WP 0549, Item 28)
0
0
0256-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.