TM 9-4940-568-20
5-54
5-13. BOOM LIGHT CABLE REPLACEMENT (Continued)
b. Installation
NOTE
Install cable ties and cushion
clamps as required.
(1) Position boom light cable (4) on crane
(5).
(2) Connect black wire (1) and white wire (2)
to boom light (3).
Follow-On Maintenance
Connect batteries
(TM 9-4940-568-10)
Connect boom light
cable to junction box
(para 5-4)
Check boom light for
proper operation
(TM 9-4940-568-10)
END OF TASK
3
4
5
1
2