TM 9-4940-568-20
5-58
5-15. BOOM LIGHT REPLACEMENT (Continued)
b. Installation
NOTE
Install boom light cable as noted
prior to removal.
Install cushion clamp as noted
prior to removal.
(1) Position boom light cable (9) in cushion
clamp (8).
(2) Position boom light (3) on crane (10)
and install boom light cable (9), cushion
clamp (8), two washers (7), screws (6),
lockwashers (5) and nuts (4).
(3) Connect black wire (1) and white wire (2)
to boom light (3).
Follow-On Maintenance
Connect batteries
(TM 9-4940-568-10)
Check boom light for
proper operation
(TM 9-4940-568-10)
END OF TASK
3
9
10
1
2
8
6
7
5
4