TM 9-2330-389-14&P
4-25.
HYDRAULIC LINES, HOSES, AND FITTINGS MAINTENANCE.
This Task Covers:
a.
Removal
b.
Cleaning and Inspection
c.
Fabrication of Brake Tube Assemblies
d.
Installation
Initial Setup:
Tools/Test Equipment:
Materials/Parts:
Common #1 tool set
Dry cleaning solvent (Item 6, Appendix E)
Common #2 tool set
Rags (Item 5, Appendix E)
General mechanic's tool kit
Self-locking nut. 145036
Drain pan
a.
REMOVAL
NOTE
Use this task to maintain left or right side hydraulic lines, hoses, and fittings.
Right side is shown.
1.
Position drain pan to catch brake fluid.
2.
Disconnect cross axle tube assembly (1) from multiple connector (2) and hose assembly (3). Remove tube
assembly (1).
3.
Remove capscrew (4), flat washer (5), and multiple connector (2) from cross axle (6).
4-28