TM 9-2330-389-14&P
4-22.
FRAME GROUP MAINTENANCE (Con't).
1.
Clean all parts with dry cleaning solvent.
2.
Inspect front and rear frame assemblies for damage. Replace any damaged parts.
d.
ASSEMBLY
1.
Slide front frame assembly (19) into rear frame assembly (18).
2.
Install lubrication fitting (22) in frame group (5).
e.
INSTALLATION
1.
Install new plain seal (17) on frame group (5). Coat cross axle with grease and slide frame group (5) on cross
axle (16) and pack with grease.
2.
Install retainer plate (15) and special self-locking nut (14) on end of cross axle (16). Torque special self-locking
nut (14) to 2100 20 lb.-ft. (285 27 Nm).
CAUTION
To prevent damage, avoid hammering in the center of hub cap. Tapping around
the circumference will prevent binding.
3.
Install hub cap (13) on frame group (5).
4
Install four new self-locking nuts (11) on four capscrews (12). Install four capscrews (12) and self-locking nuts
(11) in frame group (5), until resistance is felt while sliding rear frame assembly (18) inside front frame assembly
(19).
5.
Install adjustment bolt (10) and locking capscrew (9) in frame group (5).
4-19