TM 9-2330-389-14&P
4-21.
CROSS AXLE GROUP REPLACEMENT (Con't).
FOLLOW-ON TASKS:
Replace left and right cross axle (brake) tube assemblies (para 4-25).
Lubricate both axle pivots (Chapter 3, Section I).
Section VII. FRAME GROUP MAINTENANCE
4-22.
FRAME GROUP MAINTENANCE.
This Task Covers:
a. Removal
b. Disassembly
c. Cleaning and Inspection
d. Assembly
e. Installation
Initial Setup:
Equipment Conditions:
Tools/Test Equipment:
Inner and outer tire assemblies removed
General mechanic's tool kit
(para 4-28).
Inner and outer brakedrums removed
Materials/Parts:
(para 4-32)
Dry cleaning solvent (Item 6, Appendix E)
Inner and outer service brakes disassembled
Grease (Item 3, Appendix E)
(para 4-23)
Plain encased seal, 5P2671
Inner and outer idler hubs removed (para 4-31).
Self-locking nut, 145036 (four required)
Left and right frame tube assemblies removed
Self-locking nut, MS51922-49
(para 4-25).
Personnel Required: Two
a.
REMOVAL
1.
Remove capscrew (1), flat washer (2), and loop clamp (3) from parking brake cable (4) and frame group (5).
2.
Remove capscrew (6), flat washer (7), and multiple connector (8) from frame group (5).
4-17