4-17. POWER INLET HOUSING AND CABLE CONNECTOR REPLACEMENT.
This Task Covers:
a. Removal
c.
Installation
b.
Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts:
l 220-volt power cable disconnected.
l Dishwashing compound (Item 6, Appendix E)
Tools/Test Equipment:
l Marker tags (item 15, Appendix E)
l Two iockwashers (M749 Southwest Model VRP Serial
l General mechanics tool kit
Numbers V001-V356 and Converto Model 8929)
l Common no. 1 shop set
l Four lockwashers (all except M749 Southwest Model
VRP Serial Numbers V001-V356 and Converto Model
Personnel Required: Two
8929)
NOTE
Replacement of power inlet housing and cable connector Is similar for all models.
Differences will be pointed out as they occur.
a.
REMOVAL
1.
Open electrical box (2) on rear curbside wall inside semitrailer. Tag and disconnect wires(1) of cable connector
(16) from electrical components inside electrical box. -
. .
M447, M447C, M750, AND M313 (EARLY MODEL)
M447, M447C, M750, AND M313 (EARLY MODEL)
TA701938
4-23