TM 5-3805-296-23-6
0418
INSTALLATION CONTINUED
11. Install new O-ring (Figure 13, Item 3) on hydraulic hose (Figure 13, Item 4).
12. Install hydraulic hose (Figure 13, Item 4), two flange halves (Figure 13, Item 2), four washers
(Figure 13, Item 6), and bolts (Figure 13, Item 5) on hydraulic line (Figure 13, Item 1).
Figure 13. Line to Main Control Valve Connection.
0418