• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Air Hoses.
Figure 13. Line to Main Control Valve Connection.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  732    733    734    735    736  737  738    739    740    741    742  
img
.
TM 5-3805-296-23-6
0418
INSTALLATION CONTINUED
NOTE
Remove plugs and caps from hydraulic hoses and fittings.
Install hydraulic hoses as noted during removal.
Install hydraulic hoses as tagged and marked during removal.
9. Install new O-ring (Figure 12, Item 5) on hydraulic hose (Figure 12, Item 6).
10. Install hydraulic hose (Figure 12, Item 6), two flange halves (Figure 12, Item 3), four washers
(Figure 12, Item 2), and bolts (Figure 12, Item 1) on hydraulic line (Figure 12, Item 4).
Figure 12. Front Bowl Hose Connection.
0418
0418-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.