• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 25. Spring Linkage.
Figure 27. Spring Mount.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  503    504    505    506    507  508  509    510    511    512    513  
img
.
TM 5-3805-296-23-6
0405
INSTALLATION CONTINUED
20. Position spring linkage (Figure 26, Item 1) on machine.
21. Install leveling valve clevis (Figure 26, Item 5), pivot pin (Figure 26, Item 2), and new cotter pin
(Figure 26, Item 3) on leveling valve rod (Figure 26, Item 4).
Figure 26. Leveling Valve Clevis.
0405
0405-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.