• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 24. Tiedown Straps and 24-volt Pulse Receptacle Unit at Bracket.
Figure 26. Hood Adjustment at Hinge.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  200    201    202    203    204  205  206    207    208    209    210  
img
.
TM 5-3805-296-23-6
0388
INSTALLATION CONTINUED
NOTE
Install wiring harness connector as marked during removal.
19. Install solargizer terminal (Figure 25, Item 5), new lockwasher (Figure 25, Item 6), and bolt (Figure 25, Item 7)
on NATO slave (Figure 25, Item 8).
20. Install new tiedown strap (Figure 25, Item 3) on ladder clip (Figure 25, Item 4).
21. Install two fuses (Figure 25, Item 9) and connect 24-volt pulse receptacle connector (Figure 25, Item 1) to
connector (Figure 25, Item 2).
Figure 25. Connections at NATO Slave.
0388
END OF TASK
0388-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.