• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 24. Right Starter Cable at Right Starter.
Figure 27. Right Starter Cable at Junction Block.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  269    270    271    272    273  274  275    276    277    278    279  
img
.
TM 5-3805-296-23-5
0310
RIGHT STARTER POSITIVE CABLE INSTALLATION CONTINUED
NOTE
Route cable as noted during removal.
7. Position right starter cable (Figure 26, Item 6) on machine.
8. Install spacer (Figure 26, Item 4), P-clamp (Figure 26, Item 3), washer (Figure 26, Item 2), and bolt
(Figure 26, Item 1) on boss (Figure 26, Item 5).
Figure 26. Right Starter Cable P-clamp Beneath Hydraulic Oil Supply Tube.
0310
0310-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.