• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Positive Battery Inner Frame Mounting.
Figure 14. Positive Battery Cable.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  205    206    207    208    209  210  211    212    213    214    215  
img
.
TM 5-3805-296-23-5
0307
POSITIVE BATTERY CABLE INSTALLATION CONTINUED
NOTE
Route and install cables as noted during removal.
14. Install two bolts (Figure 13, Item 2), washers (Figure 13, Item 3), P-clamps (Figure 13, Item 1), and battery
cable (Figure 13, Item 4) on machine.
Figure 13. Positive Battery Cable Mounting Behind Batteries.
0307
0307-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.