• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Battery Positive Cable and Batteries.
Figure 8. Battery Positive Cable and Batteries.

Field Maintenance Manual For Military 621G Scraper -5 Page Navigation
  184    185    186    187    188  189  190    191    192    193    194  
img
.
TM 5-3805-296-23-5
0306
REMOVAL CONTINUED
21. Loosen four jam nuts (Figure 7, Item 2).
22. Remove two bolts (Figure 7, Item 5), spacers (Figure 7, Item 4), and bracket (Figure 7, Item 3) from machine.
23. Remove four rods (Figure 7, Item 1) from bracket (Figure 7, Item 3).
24. Remove four jam nuts (Figure 7, Item 2) from rods (Figure 7, Item 1).
Figure 7. Rods and Bracket.
0306
END OF TASK
CLEANING AND INSPECTION
000306
Clean and inspect all components IAW TM 9-6140-200-13.
END OF TASK
INSTALLATION
000306
1. Install two spacers (Figure 7, Item 4) on bolts (Figure 7, Item 5).
2. Install bracket (Figure 7, Item 3), two spacers (Figure 7, Item 4), and bolts (Figure 7, Item 5) on machine.
3. Install four jam nuts (Figure 7, Item 2) on rods (Figure 7, Item 1).
4. Install four rods (Figure 7, Item 1) on bracket (Figure 7, Item 3).
5. Tighten four jam nuts (Figure 7, Item 2).
0306-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.