Figure 8. Tube
Figure 10. Oil Cooler Bypass.

Field Maintenance Manual For Military 621G Scraper -4 Page Navigation
  244    245    246    247    248  249  250    251    252    253    254  
img
.
TM 5-3805-296-23-4
0240
ENGINE OIL COOLER BYPASS INSTALLATION
000240
1. Install two new O-rings (Figure 8, Items 2 and 6), elbow pipe (Figure 8, Item 1), and four bolts
(Figure 8, Items 3 and 5) on engine.
2. Install two new O-rings (Figure 9, Item 7) on tube (Figure 8, Item 4).
3. Install tube (Figure 8, Item 4) on elbow pipe (Figure 8, Item 1).
4. Install plunger (Figure 9, Item 2), spring (Figure 9, Item 3), new gasket (Figure 9, Item 4), cap (Figure 9,
Item 5), two washers (Figure 9, Item 6), and bolts (Figure 9, Item 7) on oil cooler bypass manifold
(Figure 9, Item 1).
Figure 9. Plunger.
0240
0240-9