TM 5-3805-296-10
0012
Table 1. Preventive Maintenance Checks and Services (PMCS) Continued.
ITEM TO BE
ITEM
MAN-
CHECKED OR
EQUIPMENT NOT
NO.
INTERVAL
HOURS
SERVICED
PROCEDURE
READY/AVAILABLE IF:
11
Before
Right Rear
(Cont.)
Wheel and Tire
Figure 8. Rear Wheel and Tire.
0012
12
Before
Draft Frame,
a. Check hydraulic lines and
Class III hydraulic leaks
Scraper Bowl,
hoses and air lines along right
or any air leak is evident.
Apron, Ejector,
draft frame for damage or
Loose or missing
and Rollers
signs of leaking and secure
mounting hardware is
mounting.
noted.
b. Check electrical wiring and
Wires or connectors are
connectors for damage and
damaged.
secure mounting.
c. Check right bowl lift
Class III leaks are
cylinders, hoses, lines, and
evident. Loose or missing
fittings for damage or signs of
mounting hardware is
leaking and secure mounting.
noted.
d. Visually check bowl cutting
Damage that would
edge and right side router bit
impair operation is
for damage and loose or
evident. Cutting edge
missing mounting hardware.
worn sufficiently to allow
damage to base edge.
e. Check apron for damage
Damage that would
or obstructions.
impair operation is
evident.
f. Check for damage or
Damage that would
obstructions inside bowl.
impair operation is
evident.