TM 5-3805-296-10
0012
Table 1. Preventive Maintenance Checks and Services (PMCS) Continued.
ITEM TO BE
CHECKED OR
EQUIPMENT NOT
ITEM
MAN-
SERVICED
PROCEDURE
READY/AVAILABLE IF:
NO.
INTERVAL
HOURS
5
Before
Draft Frame,
a. Check hydraulic lines,
Class III hydraulic leaks
hoses, and air lines along
or any air leak is evident.
Scraper Bowl,
draft frame for damage or
Loose or missing
Apron, and
signs of leaking and secure
mounting hardware is
Ejector
mounting.
noted.
b. Check electrical wiring and
Wires or connectors are
connectors for damage and
damaged.
secure mounting.
c. Check left bowl lift
Class III leaks are
cylinders, hoses, lines, and
evident. Loose or missing
fittings for damage or signs of
mounting hardware is
leaking and secure mounting.
noted.
d. Visually check bowl cutting
Damage that would
edge and left side router bit
impair operation is
for damage and loose or
evident. Cutting edge
missing mounting hardware
worn sufficiently to allow
damage to base edge.
e. Check apron for damage
Damage that would
or obstructions.
impair operation is
evident.
f. Check for damage or
Damage that would
obstructions inside bowl.
impair operation is
evident.
g. Check for damage to
Damage that would
ejector.
impair operation is
evident.
Figure 4. Ejector.
0012