TM 9-6230-210-13&P
Section VI
Preparation for Storage and Shipment . . . . . . . . . . . . . . . . . . . . . . . . . . 4-83
4.33 . . Administrative Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-83
SECTION I. REPAIR PARTS; TOOLS; SPECIAL TOOLS; TEST
MEASUREMENT, AND DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT
EQUIPMENT
4.1 COMMON TOOLS AND EQUIPMENT.
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE), CTA
50-970, or CTA 8-100, as applicable to your unit.
4.2 SPECIAL TOOLS. TMDE, AND SUPPORT EQUIPMENT.
No special tools or equipment are required for maintenance of the Floodlight Set.
4.3 REPAIR PARTS.
Repair parts are listed and illustrated in Appendix C of this manual.
SECTION II. SERVICE UPON RECEIPT
4.4 SITE AND SHELTER REQUIREMENTS.
Refer to paragraph 2.7 for site selection and requirements. There are no shelter requirements for this equipment.
4.5
a.
SERVICE UPON RECEIPT OF MATERIEL
Unpacking.
(1) When either a new or used Floodlight Set is received, it must be uncrated and inspected to make certiain all
items are accounted for and in serviceable condition.
(2) If any component or part of the Floodlight Set is packed in a reusable container of special design, avoid
damage to the container when unpacking. Check with your supply officer and reenter the empty container into the
supply system in accordance with AR 746-1.
(3) Unpacking auxiliary equipment.
(a) Refer to TM 9-2805-258-14 for additional information on unpacking the MIL Standard Engine.
(b) Refer to TM 5-6115-271-14 for additional information on unpacking the 3kW Generator Set.
(c) Refer to TM 9-2330-251-14 for additional information on unpacking the Trailer.
(4) Under normal conditions, one soldier, MOS 63B, can unpack the Floodlight Set in (3) hour(s).
(5) The floodlight Set will be shipped to your unit in several containers. Check that below listed parts are
accounted for and complete.
4-2