TM 9-6230-210-13&P
SECTION Il. DIRECT SUPPORT MAINTENANCE PROCEDURES
5.4 TOWER ASSEMBLY.
This task covers:
a. Inspect
b. Repair
INITIAL SETUP
Tools
Equipment Condtion
Master Mechanics Tool Kit (item 3, sect III, appx B)
Tower removed (para 4.14)
Welding Set (item 6, sect III, appx B)
Tower disassembled para 4.14)
Materials/Parts
Personnel Required
Welding Rods (item 25, appx E)
MOS 52D Power Generation Repairman
INSPECT
Inspect the tower sections for washed or broken welds and distortions.
REPAIR
a.
b.
c.
d.
Weld cracked or broken welds in tower sections. Grind smooth. Spot paint as necessary.
If tower section (s) are damaged beyond repair, replace tower sections.
Assemble tower (para 4.1 4).
Install tower (para 4.14).
5-2