TM 9-4940-568-20
5-45
b. Installation
NOTE
Install cable ties and
cushion
clamps
as
required.
(1) Position solenoid cable (1) on crane
(12).
NOTE
Wires to all control valves are
installed the same way.
Perform Step (2) if working on
FRS crane funciton solenoids.
Perform Step (3) if working on
FRS overload lockout solenoid.
(2) Install gasket (10) and connector (9)
and tighten screw (8).
(3) Install cover (6) on bracket (7) with four
washers (5), lockwashers (4) and
screws (3).