TM 9-4940-568-20
5-42
5-10. OVERLOAD SHUTDOWN CABLE REPLACEMENT (Continued)
b. Installation
NOTE
Install cable ties and
cushion
clamps
as
required.
(1) Position overload shutdown cable (1) on
crane (3).
(2) Connect overload shutdown cable (1) to
overload shutdown box (2).
END OF TASK
Follow-On Maintenance
Install overload
shutdown cable in
junction box
(para 5-4).
Connect batteries
(TM 9-4940-568-10)
Check crane for proper
operation
(TM 9-4940-568-10)