TM 9-2330-359-14&P
3. Fabricate two hinge lugs. Remove all existing hinge from bulkhead. Replacement fabsrication requires one on
outboard side of each outer crossmember.
4. Fabricate up to eight hinge fold-overs and four hinge pins. There should be four hinge fold-overs on the fold-over
channel and four on the bulkhead body. Count hinges that can still be used on bulkhead and make correct number of
hinge fold-overs and four hinge pins.
Ends may be sheared or clipped and must pass
into a 5/8 diameter hole
5-24 Change 1