TM 5-4930-244-14
f. Installation.
NOTE
Wires are already tagged and numbered In the procedures below, tag numbers are
precede by a "#" symbol Illustration numbers are in parenthesis.
(1)
Place control panel (2) onto air-receiver tank mounting base (38) Position panel (2) in such a way as to make the
connecting of wires easiest.
(2)
Connect wires #27 and #28 (24) to glow plug switch (25).
(3)
Connect wires #5, #10, #23 (9) to run/stop switch (27).
(4)
Connect wire #26 (7) to crank switch (29).
(5)
Connect oil pressure wire #20 (30) to oil pressure gauge (31).
(6)
Connect fuel level wire #21 (32) to fuel gauge (33).
(7)
Connect wires #8 and #13 (39) to shunt (35).
(8)
Remove thumb screw from side of each panel light housing (36) Connect wire #6 (37) to fixture of light (36) above
the ammeter (40). Connect wire #7 (37) to fixture of light (36) above the air pressure gauge (8). Replace light
fixtures into light housings (36) and replace thumb screws (45).
(9)
Install pin (18) holding throttle assembly (1) to air cylinder support bracket (15) Insert cotter pin (17) into pin (18)
Spread cotter pin (17) apart to secure It against pin (18).
(10)
Insert pin (20) holding throttle assembly (1) to upper throttle bracket (16), which is attached to diesel engine.
Insert and spread cotter pin (19).
(11)
Install throttle chain (12) onto throttle bracket (11).
(12)
Install tension spring (14) to air cylinder support bracket (15) and upper throttle bracket (16).
(13)
Tighten throttle adjustment knob (10) until throttle chain (12) is tight.
(14)
Connect air line (7) to air pressure gauge (8) (15) Reconnect negative (ground) battery cable (para 4-26).
4-75
