TM 5-3825-230-14&P
NOTE
Follow-on maintenance:
Install oil pan (para 4-30)
Install speed governor and support yoke assembly (para 5-34)
Install injection pump (para 5-33)
Install fuel filter housing (para 4-49)
Install fuel pump (para 4-35)
Install oil filter housing (para 4-29)
Install starter (para 4-58)
Install cylinder head (para 5-13)
Check valve clearance (para 5-25)
Install engine (para 4-24)
Reset engine timing (para 5-7)
END OF TASK
5-59