• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Bowl Hose to Bowl Line Connection.
Figure 13. Draft Frame Line.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  748    749    750    751    752  753  754    755    756    757    758  
img
.
TM 5-3805-296-23-6
0419
INSTALLATION CONTINUED
4. Install new O-ring (Figure 12, Item 4) on hydraulic hose (Figure 12, Item 1).
5. Install hydraulic hose (Figure 12, Item 1), two flange halves (Figure 12, Item 6), four washers
(Figure 12, Item 3), and bolts (Figure 12, Item 2) on hydraulic line (Figure 12, Item 5).
Figure 12. Left Inboard Hose to Bowl Line Connection.
0419
0419-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.