• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 51. Bowl Down Line Connection.
Figure 53. Bowl Up Line Connection.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  714    715    716    717    718  719  720    721    722    723    724  
img
.
TM 5-3805-296-23-6
0417
CONTROL VALVE HOSES INSTALLATION CONTINUED
49. Install new O-ring (Figure 52, Item 6) on hydraulic hose (Figure 52, Item 2).
50. Install hydraulic hose (Figure 52, Item 2), two flange halves (Figure 52, Item 4), four washers
(Figure 52, Item 5), and bolts (Figure 52, Item 1) on rear main control valve (Figure 52, Item 3).
Figure 52. Bowl Down Control Valve Connection.
0417
0417-46


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.