• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 53. Bowl Up Line Connection.
Figure 55. Inboard Pin Mount.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  716    717    718    719    720  721  722    723    724    725    726  
img
.
TM 5-3805-296-23-6
0417
CONTROL VALVE HOSES INSTALLATION CONTINUED
53. Install new O-ring (Figure 54, Item 3) on hydraulic hose (Figure 54, Item 2).
54. Install hydraulic hose (Figure 54, Item 2), two flange halves (Figure 54, Item 4), four washers
(Figure 54, Item 6), and bolts (Figure 54, Item 1) on rear main control valve (Figure 54, Item 5).
Figure 54. Bowl Up Control Valve Connection.
0417
0417-48


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.