TM 5-3805-296-23-2
0126
Table 1. Load Cylinder Rod Does Not Extend Fully Continued.
0126
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Load Cylinder Rod Does Not
Test Step 4. Test Pump Control Valve
Extend Fully Continued
Adjustment.
NOTE
Nipple 6V3989 and hose 143516 are from Gauge, Pressure Kit 1U5482.
Gauge 8T0859 is from Gauge Kit, Pressure, Dial Indicating 1U5796.
1. Assemble test gauge and hose as
follows:
a. Apply sealing compound to
threads of gauge
(Figure 5, Item 1).
b. Install nipple (Figure 5, Item 6)
on gauge (Figure 5, Item 1).
c.
Connect hose quick
disconnect coupling
(Figure 5, Item 5) to nipple
(Figure 5, Item 6).
d. Remove cover
(Figure 5, Item 4) from test
port (Figure 5, Item 3).
e. Connect hose quick
disconnect coupling
(Figure 5, Item 2) to test port
(Figure 5, Item 3).
f.
Position gauge
(Figure 5, Item 1) where it can
be easily read away from
machine.
Figure 5. Assembling Test Gauge and Hose.
0126