• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
M87 GAS-PARTICULATE FILTER UNIT - Continued
M87 GAS-PARTICULATE FILTER UNIT - Continued

Technical Manual For Collective Protection Equipment, Guardrail With Accessories
Page Navigation
  101    102    103    104    105  106  107    108    109    110    111  
img
TM
3-4240-309-20&P
ACTION
LOCATION
ITEM
Red tubing
1. Push red tube coupling nuts (6 and 8) with
Housing  Unit/Power
sleeves on red tube (10). See detail A.
(nonmetallic)
Distribution  Unit
2. Push one end of tube (10) into connector (7)
and one end into connector (9). RED dot on
power distribution unit indicates connector (9).
3. Push red tube coupling nut (6) with sleeve
onto connector (7) and hand tighten.
4. Push red tube coupling nut (8) with sleeve
onto connector (9) and hand tighten.
Push green tube coupling nuts (1 and 3) with
5.
Green tubing
sleeves on green tube (5). See detail A.
(nonmetallic)
Push one end of green tube (5) into connector
6.
(2) and one end into connector (4). GREEN dot
on power distribution unit indicates
connector (4).
7.
Push green tube coupling nut (1) with sleeve
onto connector (2) and hand tighten.
8.
Push green tube coupling nut (3) with sleeve
onto connector (4) and hand tighten.
2-97


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.