TM 5-3805-296-23-6
0406
INSTALLATION CONTINUED
NOTE
Install wiring harness as tagged and marked during removal.
Install tiedowns as noted during removal.
5. Install leveling valve harness connector (Figure 8, Item 4) on bracket (Figure 8, Item 6).
6. Connect machine wiring harness connector (Figure 8, Item 5) to leveling valve harness connector
(Figure 8, Item 4).
7. Install wiring harness (Figure 8, Item 1) and new tiedown strap (Figure 8, Item 2) on ladder clip
(Figure 8, Item 3).
Figure 8. Wiring Connector.
0406
END OF TASK
FOLLOW-ON TASKS
000406
Verify correct operation of machine (TM 5-3805-296-10).
END OF TASK
END OF WORK PACKAGE