3-33. FIVE FUNCTION CONTROL VALVE BANK REPLACEMENT (Continued)
(7) Install nine preformed packings (16),
tube (15) and 13 hoses (14).
(8) Install three preformed packings (13),
backup rings (12), preformed packings
(11), valves (10), solenoids (8) and nuts
(9).
(9) Install three gaskets (7), position
connectors (6) and tighten screws (5) on
solenoids (8).
(10) Install cover (4), four washers (3),
lockwashers (2) and screws (1).
END OF TASK
Follow-On Maintenance
Install electric solenoid
valves (para 3-37).
Adjust hoist and hydraulic
pressure (para 3-41
and 3-42)
Connect batteries
(TM 9-4940-568-10).
Check crane for leaks
and proper operation
(TM 9-4940-568-10).