2-29. MATERIAL HANDLING CRANE (MHC) OPERATION (CONT).
Operator must keep control of load at all times. Attach guide lines to load as required.
Failure to comply may result in injury or death to personnel.
Keep hook assembly at least 2 ft (0.6m) from end of boom. If hook assembly hits end
of boom, crane will lose power for several seconds and cable or hook assembly may be
damaged.
NOTE
Operate HOIST lever and TELESCOPE lever at the same time.
(3)
Move HOIST lever (26) to DOWN position to pay out cable (44) and TELESCOPE lever (45) to OUT
position to extend boom (43).