43
42
TM 9-4940-568-10
2-135
g.
Rotate and Telescope Boom.
Keep boom clear of shelter, all electrical lines, and other obstacles while operating the
crane. Failure to comply may result in injury or death to personnel.
Ensure that area is clear of personnel before rotating boom. Boom must be rotated slowly
enough so operator has complete control of load. If operator cannot see load during
operation, operate crane with remote control. Failure to comply may result in injury or
death to personnel.
Keep hands and feet clear of outriggers during operation. Failure to comply may result in
injury to personnel.
NOTE
Operate crane control levers using even pressure. Moving lever slightly will cause slow
movement of crane. Moving lever to full travel will cause faster movement of the
crane.
(1)
Move SWING lever (42) to CW position to move boom (43) to the right (when viewed from behind the
boom).
(2)
Move SWING lever (42) to CCW position to move boom (43) to the left (when viewed from behind the
boom).
