B - Before
D - During
A - After
W - Weekly
ITEM
NO.
INTERVAL
ITEM TO BE INSPECTED
PROCEDURE: Check for and have repaired, filled or
adjusted as needed
Equipment Is Not
Ready/Available If:
B
D
A
W
TM 9-2330-389-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS).
2
TRACK BELT.
Inspect track belt for rips, rears, chunking, or uneven
Track has more than five cen-
wear.
ter guideblocks in a row miss-
ing, five-inch lateral or verti-
cal cut with steel belt visible,
tread wear with steel belt
visible.
3
AXLE PIVOT SEAL.
Inspect area around axle pivot seal for heavy grease
Heavy grease build-up in
build-up. (Minimal grease seepage is considered
of pivot seal.
normal.)
2-6