TM 9-2330-238-14
5-26. HINGED ROOF MAINTENANCE (M313).
This Task Covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning, Inspection, and Repair
Initial Setup:
Equipment Conditions:
Materials/Parts:
l Van body expanded (para 2-13).
l Two gaskets
Tools/Test Equipment:
l Six cotter pins
l General mechanics tool kit
Personnel Required: Three
l Hoist
l Sling
I
a.
REMOVAL I
1.
Support hinged roof (18) in open position with sling and hoist.
2.
Disconnect wire rope assembly from counterbalance (para 4-60).
3.
Remove eight screws (11) and four pivot assemblies (10) from hinged roof (18).
4.
Remove 75 screws (2) from hinge (1) and van body and lower hinged roof (18) to ground.
b. DISASSEMBLY I
1.
2.
3.
4.
5.
6.
7.
8.
9.
Remove 75 screws (2), hinge (1), and rubber strip (3) from hinged roof (18).
Remove 20 screws (27) and two access covers (26) from hinged roof (18).
Remove two cotter pins (21) and headed straight pins (25) from two locking bar rod end clevises (24) and latch
(20). Remove locking bar rod end clevises from latch. Discard cotter pins.
Perform step 3 for remaining two clevises (24) and latches (20).
Remove eight nuts (30), Iockwashers (31), and two latches (20) from hinged roof (18).
Slide four locking bars (23 and 32) out of hinged roof (18).
Remove cotter pins (28), washers (29), two screws (4), handle (5), and two gaskets (6 and 7) from hinged roof
(18), Discard gaskets and cotter pins.
Remove 12 screws (12) and three clamp assembly yolks (44) with assembled handles (36), clevises (14),
eyebolts (33), and nuts (15) from hinged roof (18).
Remove four screws (22) and handle (19) from hinged roof (18).
I c.
CLEANING, INSPECTION, AND REPAIR I
1.
Clean parts with steam or water.
2.
Inspect latch for ease of operation.
3.
Inspect locking bars for cracks, bends, or breaks.
5-74